MIL -PRF-53012A
4.2 First article inspection. The first article inspection shall be performed on a minimum of
one hoseline suspension kit (see 3.2 and 6.2). This inspection shall include the examination of
table II. Nonconformance to any specified requirement or the presence of one or more defects
shall be cause for rejection.
4.3 Conformance inspection. Conformance inspection shall be performed on all hoseline
suspension kit production units and shall include the examinations indicated in the conformance
column of table II. Nonconformance to any specified requirement, the failure of any test, or the
presence of one or more defects shall be cause for rejection.
4.4 Examination. The first article hoseline suspension kit shall be examined for defects as
specified in table II.
4.4.1 Material design and construction. Conformance to 3.3 shall be determined by visual
inspection and review of contractor records providing proof or certification that components
conform to the material requirements. Applicable records shall include receiving inspection
records, vendor catalogues and certifications, and commercial standards.
4.4.2 Examination. The type I or type II collapsible hoseline suspension kit shall be examined
for the defects specified herein.
TABLE II. Examinations for type I or type II suspension kits.
Number
Conformance
Examination description
Method of
examination
101
X
Component quantities not as specified (see 3.3.1).
Visual
102
Wire rope not as specified (see 3.4.1).
Visual/SIE
103
Fiber rope not as specified (see 3.4.2).
Visual/SIE
104
Wire rope clip not as specified (see 3.4.3).
Visual/SIE
105
Shackle not as specified (see 3.4.4).
Visual
106
Hose saddle not as specified (see 3.4.5).
Visual/SIE
107
Anchor not as specified (see 3.4.6).
Visual/Doc.
108
Block not as specified (see 3.4.7).
Visual
109
Turnbuckle not as specified (see 3.4.8).
Visual/SIE
110
Wire rope thimble not as specified (see 3.4.9).
Visual/SIE
111
Hoist not as specified (see 3.4.10).
Visual/Doc.
112
Storage chest not as specified (see 3.5.1).
Visual
113
Materials not as specified (see 3.5.2).
Visual/Doc.
SIE = Standard Inspection Equipment
Doc. = Document
5. PACKAGING
5.1 Packaging. For acquisition purposes, the packaging requirements shall be as specified in
the contract or order (see 6.2). When actual packaging of materiel is to be performed by DoD
personnel, these personnel need to contact the responsible packaging activity to ascertain requisite
packaging requirements. Packaging requirements are maintained by the Inventory Control Point's
5
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business